Case Study

SEE M&E Project: Lillie Square Mechanical and Electrical Fit Out

08th December 2017 - 9 months ago

Client: Sir Robert McAlpine

Project: M&E Fit Out

Main Contractor: Sir Robert McAlpine

Location: Fulham, SW6 1UE

Value: £2,000,000

Contract Start: March 2016

Contract End: September 2017

SEE were selected by Sir Robert McAlpine to deliver the Mechanical and Electrical Fit Out of Lillie Square, 15 Penthouses, a part of the 808 Earl’s Court development scheme which will provide apartments across four buildings.

These comprise of a seven-storey building divided into four blocks, a 16-storey glazed tower and two seven-storey gateway blocks which will flank the main entrance to the development. A single-storey car park runs underneath the scheme.

Lillie Square is a new exclusive London development, which takes the traditional London garden square as its inspiration. The Penthouse Collection offers the very best in luxury urban living with unrivalled views across West and Central London.

Scope of Work:

The scope of works includes the installation of the following:

• MVHR Systems

• Primary and Secondary Ventilation Ductwork

• Fan Coil Units

• Low Temperature Hot Water (LTHW) System

• Chilled Water System (CHW) System

• Domestic Water System

• Heat Interface Units (HIU) Installation

• Above Ground Drainage

• Low Voltage (LV) Power and Lighting

• Fire Alarms

• Data

• TV and Audio

• Lutron Lighting Control