Case Studies

13th August 2014 - 3 years ago

Installation of Biomass Boiler System at Sainsburys Store

We were engaged by Sainsbury’s to design, install and commission a free issue biomass boiler system connected to the existing LTHW system.
View Case Study

13th August 2014 - 3 years ago

Installation of Biomass Boiler System at Sainsburys Store

We were engaged by Sainsbury’s to design, install and commission a free issue biomass boiler system connected to the existing LTHW system.
View Case Study

13th August 2014 - 3 years ago

Refurbishment works to Shell Garages

To refurbish existing Shell Petrol Retail Stations and carry out the conversion of newly acquired petrol stations.
View Case Study

13th October 2014 - 3 years ago

Surgical Facility Wexham Park Hospital

This new purpose built two storey surgical facilities building includes three ultra clean operating theatres and five general theatres and sundry areas and offices.
View Case Study

13th August 2014 - 3 years ago

Norlands - Quadrant House

Installation and commissioning of a new hot water packaged plantroom and the replacement of existing gas fired LTHW boilers.
View Case Study